Appendix
A - Transport & Highways Schemes |
|
|
|
|
|
|
|
|
Programme |
Scheme |
Capital Estimate £000 (incl
fees) |
Funding Source |
Scheme Details |
|
|
Category |
|
|
|
|
|
£000 |
£000 |
|
|
|
20mph Zones |
Zone 10 arbour square |
130 |
TfL |
Signing
for 20 mph zone and traffic calming which will be designed to slow traffic
and to improve accessability for pedestrians moving around within the zone
e.g junction entry treatments and
speed tables. |
|
|
Bus Priority |
Vallance road /bethnal green
road junction |
30 |
TfL |
Junction
Review |
|
|
Bus Priority |
Chrisp street |
50 |
TfL |
Implementation
of measures from D8 Bus Route Studt (27/11/08) Footway cutback to inset pay
& display parking in front of Somerfield car park, modifications to speed
table (j/w Goldalming St) and revised Waiting & Loading |
|
|
Bus Priority |
Cordelia street |
66 |
TfL |
Implementation of measures from 309 Bus Route Study
(27/10/08). Rationalise traffic calming. |
|
|
Bus Priority |
Blair street |
44 |
TfL |
Implementation of measures from 309 Bus Route Study
(27/10/08). Alterations to traffic calming and relocation of on-street
parking bays and bus stops. |
|
|
Bus Priority |
Aberfeldy street |
45 |
TfL |
Implementation of measures from 309 Bus Route Study
(27/10/08). Alterations to traffic calming and relocation of on-street
parking bays including inset parking bay. |
|
|
Bus Priority |
Burcham street |
25 |
TfL |
Parking
survey with a view to half on half off parking. |
|
|
Bus Priority |
Borough administration |
15 |
TfL |
Contribution
to Borough Project Management Costs. |
|
|
Bus Stop Accessibility |
BSA stop no.bp2691 |
10 |
TfL |
To
improve accessibility for boarding and alighting buses, by the provision of
pavement work and kerb re-alignments or height alterations and the removal or
relocation of any obstructions. |
|
|
Bus Stop Accessibility |
BSA stop no.bp2692 |
10 |
TfL |
To
improve accessibility for boarding and alighting buses, by the provision of
pavement work and kerb re-alignments or height alterations and the removal or
relocation of any obstructions. |
|
|
Bus Stop Accessibility |
BSA stop no.bp2698 |
10 |
TfL |
To
improve accessibility for boarding and alighting buses, by the provision of
pavement work and kerb re-alignments or height alterations and the removal or
relocation of any obstructions. |
|
|
Bus Stop Accessibility |
BSA stop no.15141 |
10 |
TfL |
To
improve accessibility for boarding and alighting buses, by the provision of
pavement work and kerb re-alignments or height alterations and the removal or
relocation of any obstructions. |
|
|
Bus Stop Accessibility |
BSA stop no.36868 |
10 |
TfL |
To
improve accessibility for boarding and alighting buses, by the provision of
pavement work and kerb re-alignments or height alterations and the removal or
relocation of any obstructions. |
|
|
Bus Stop Accessibility |
BSA stop no.15136 |
10 |
TfL |
To
improve accessibility for boarding and alighting buses, by the provision of
pavement work and kerb re-alignments or height alterations and the removal or
relocation of any obstructions. |
|
|
Appendix A - Transport
& Highways Schemes (Cont) |
|
|
|
Programme |
Scheme |
Capital Estimate £000 (incl
fees) |
Funding Source |
Scheme Details |
|
|
Category |
|
|
|
|
|
£000 |
£000 |
|
|
|
Bus Stop Accessibility |
BSA stop no.3201 |
10 |
TfL |
To
improve accessibility for boarding and alighting buses, by the provision of
pavement work and kerb re-alignments or height alterations and the removal or
relocation of any obstructions. |
|
|
Environment |
Eco-lock bike |
15 |
TfL |
OYBike
cycle hire scheme. Under review with TfL to ensure no duplication with
Mayor's bike hire scheme. |
|
|
Environment |
Spitalfields/brick lane pm2.5
monitoring |
20 |
TfL |
Approx.
10 stations will be located in designated area to monitor the impact of PM2.5 and justify the sustainable
transport improvements e.g.20mph zones and to monitor and improve air quality
in Spitalfields area and along Brick Lane. |
|
|
LCN |
Link 195 - Narrow Street between
Spert Street and Horseferry Road |
200 |
TfL |
Consider
cycle contraflow or shared area with pedestrian priority. Include parking
review and improved access to swing bridge. |
|
|
LCN |
Link 195 - St James Garden |
20 |
TfL |
Upgrade
access to & from the park, including the tactiles, signing and
improvements to layout of gate and shared use area. |
|
|
LCN |
Link 200 - the greenway |
20 |
TfL |
Redesign
cycle barrier, lighting, markings, improve entrance to Greenway. |
|
|
LCN |
Link 200 - old ford road |
70 |
TfL |
Provide
a cycle contraflow, upgrade signals. |
|
|
LCN |
Link 199 - vyner street; mowlem
street; |
55 |
TfL |
General
Improvements along cyclr route 199: signing lining etc. |
|
|
Local Safety Schemes |
Cable st/watney st |
100 |
TfL |
Proposed
amendment to street furniture at j/w Cable Street and one way working
northbound between Martha Street and Cable Street |
|
|
Local Safety Schemes |
Speed indicator devices |
5 |
TfL |
Installation
of 5 further Speed Indicator Devices |
|
|
Local Safety Schemes |
Zebra crossing halos |
120 |
TfL |
Zebrite
belisha beacon Halos to be erected to a number of belisha beacons in Old Ford
Road & Globe Road. |
|
|
Non-LCN+ Cycling Schemes |
Cycle parking |
30 |
TfL |
Continuation
of Installation programme of cycle parking racks. |
|
|
|
|
|
|
|
|
|
Non-LCN+ Cycling Schemes |
Cycle scheme 02 |
30 |
TfL |
Castlemaine
Street |
|
|
Non-LCN+ Cycling Schemes |
Delivery & signage - ncn
routes 1 & 13 |
50 |
TfL |
Signing
and lining, as lead borough for programme covering routes crossing several
boroughs. |
|
|
Principal Road Renewal |
Cambridge heath road |
277 |
TfL |
Resurfacing,
adjust ironwork, thermoplastic lining and anti-skid treatment. Upgrade of
street lighting. |
|
|
School Travel Plans |
Old ford school |
30 |
TfL |
To
implement safer route to school type works in the vicinity of schools with
approved travel plans who have requested streetscape measures to encourage
more walking and cycling by students and staff, and reduce car usage by the
whole school community. |
|
|
Travel Awareness |
In my town without car (car free
day) |
10 |
TfL |
To
raise awareness of alternative travel options and encourage individuals to
leave their car at home. |
|
|
Appendix A - Transport
& Highways Schemes (Cont) |
|
|
|
|
|
|
|
|
|
|
Programme |
Scheme |
Capital Estimate £000 (incl fees) |
Funding Source |
Scheme Details |
|
|
Category |
|
|
|
|
|
£000 |
£000 |
|
|
|
Travel Awareness |
Bike week |
9 |
TfL |
To
raise awareness of alternative travel options and encourage individuals to
consider using a bike as a means of transport |
|
|
Travel Awareness |
Estate cycling plan |
8 |
TfL |
There
are strong request from the public and small businesses for on street cycle
parking, further more recent survey from local housing estates indicated a
strong support and demand for cycle storage in local areas. |
|
|
Walking |
Abbott road |
153 |
TfL |
Closure
of Abbott Road adjacent to local park to improve accessibility and create a
more pleasant environment in the vicinity of the park. |
|
|
Walking |
Mile end to limehouse |
65 |
TfL |
On
going project to create a viable new green walking route between Limehouse
Stations (DLR &NR) and Mile End Park/Mile End Stadium. Improve pedestrian
priority at junctions and crossing facilities along the route, accessibility,
sightlines and signage; attractiveness, interest and human scale of the
route. |
|
|
Street Lighting |
Street Lighting Improvements |
200 |
LPP |
Planned maintenance to prolong the life of the
asset whilst introducing more sustainable infrastructure to reduce energy
usage. |
|
|
Low energy lanterns |
|
|
Olympic Development |
Optems feasibility work |
25 |
ODA
(Sec106) |
To
develop schemes for future funding bids relating to ameliorating traffic
impact of the Games. |
|
|
|
|
|
|
|
Environmental
Improvements |
Cuba Street - Footways |
13 |
S106 |
Replace and
renew footways. |
|
|
|
|
|
|
|
|
|
Cycling on Greenways |
Bethnal Green to
Olympic Park |
50 |
TfL |
Sustrans connect 2
route with 25k in 2010/11 |
|
|
|
|
|
|
|
|
|
Environmental improvements |
Cuba
Street, Manilla Street, Tobago Street and Byng Street |
871 |
S106 |
Streetscene,
traffic calming , traffic management , cycle / pedestrian and environmental improvements. |
|
|
|
|
Olympic Walking and Cycling Programme |
Salmon Lane junction with
Rhodeswell Rd (Datasheet 7a) |
45 |
TfL |
Reassement of
priority at this junction to improve facility for cyclist |
|
|
Olympic Walking and Cycling Programme |
South of Roman Road - Mile End
Park underneath the bridge on Roman Road (Datasheet 2a) |
10 |
TfL |
Chicanes on
either side of the bridge |
|
|
Olympic Walking and Cycling Programme |
Mile End Park (north) (Datasheet
2a) |
12 |
TfL |
Parallel access
point through the park, i.e. not at 90 degrees to towpath with improved
signing |
|
|
Olympic Walking and Cycling Programme |
Mile End Park Central - Route
through Palm Tree PH (Datasheet 3a) |
5 |
TfL |
Propose cycle
route through the car park, siging and marking |
|
|
Olympic Walking and Cycling Programme |
Railway Bridge,
Mile End Park next to Climbing wall (Datasheet 4a) |
25 |
TfL |
Widen
towpath for 50m including relocating lighting columns - proposal to
incorporate works with the new bridge (Meath Bridge) |
|
|
Olympic Walking and Cycling Programme |
Regents Canal - Railway Bridge,
Mile End Park (Datasheet 4a) |
5 |
TfL |
Lighting to be
provided under rail bridge |
|
|
Olympic Walking and Cycling Programme |
Mile End Park Central - Between
Roman Rd and Mile End Park (Datasheet 5a) |
10 |
TfL |
Remove barriers
at entrance to park and replace with soft planting to create chicane effect |
|
|
Appendix A - Transport
& Highways Schemes (Cont) |
|
|
|
Programme |
Scheme |
Capital Estimate £000 (incl
fees) |
Funding Source |
Scheme Details |
|
|
Category |
|
|
|
|
|
£000 |
£000 |
|
|
|
Olympic Walking and Cycling Programme |
Rhodeswell Rd/Mile End Park
Entrance (Datasheet 7a) |
10 |
TfL |
Remove
section of railings and bollards to widen approach for cyclist |
|
|
Olympic Walking and Cycling Programme |
Regents Canal Towpath - Between
Chimney & toucan crossing of Rodeswell Rd (Datasheet 7a) |
25 |
TfL |
Widen towpath
into the park to facilitate shared use path |
|
|
Olympic Walking and Cycling Programme |
Past chimney to Turners Rd (Datasheet
7a) |
40 |
TfL |
Improve diverge past
chimney for cyclist |
|
|
Olympic Walking and Cycling Programme |
Narrow Street (Datasheet 5a) |
12.15 |
TfL |
Provide
contra-flow cycle facility |
|
|
Olympic Walking and Cycling Programme |
Narrow Street/Thames Path (Datasheet
4f) |
|
|
Install
mirror |
|
|
Olympic Walking and Cycling Programme |
Ornamental
Canal, Waterman Way/Mace Close (Datasheet 3a) |
20.25 |
TfL |
Replace
stairs with access ramps |
|
|
Olympic Walking and Cycling Programme |
Keppier Wharf, Thames Path (Datasheet
4f) |
35.303 |
TfL |
Remove
stepped area, widern access ramp and relocate seating |
|
|
Olympic Walking and Cycling Programme |
Glamis Road (Datasheet 4b) |
36.855 |
TfL |
Crossing
facility for cyclist across Glamis Road, install chicane to slow traffic |
|
|
Olympic Walking and Cycling Programme |
Thames Path -
Stone Stairs/Jardine Road (Datasheet 4d) |
12.42 |
TfL |
Feasibility
study to replace bridge |
|
|
Olympic Walking and Cycling Programme |
Shadwell basin - Glamis Road
(Datasheet 4a) |
38.813 |
TfL |
Widen
section around 90 degree bend with cantilevered structure |
|
|
Olympic Walking and Cycling Programme |
Manchester Rd (Datasheet 2c) |
44.8 |
TfL |
Advisory
cycle lane |
|
|
Olympic Walking and Cycling Programme |
Island Gardens (Datasheet 2d) |
44 |
TfL |
New
route through park |
|
|
Olympic Walking and Cycling Programme |
Prestons Road (Datasheet 2b) |
1.7 |
TfL |
Advisory
cycle lane |
|
|
Olympic Walking and Cycling Programme |
Blackwall Way (Datasheet 2a) |
4 |
TfL |
Improve
lighting |
|
|
Sustrans |
Bethnal Green to Victoria park |
300 |
Sustrans |
Improve
facility on Sustrans connect 2 route with 100k in 2010/11, 100k already
approved via Meath Bridge cabinet report on 11th Feb 09 |
|
|
|
|
3,658 |
|
|
|
Total |
|
|
|
|
|
Appendix B - Other Schemes |
|
|
|
|
|
|
|
Category |
Scheme |
Capital Estimate (incl Fees) |
Funding Source |
Scheme Details |
|
|
|
|
£000 |
£000 |
|
|
|
Key Parks |
Bethnal Green Gardens
Improvements. |
460 |
LPP/Sec 106 |
Improvements
to sport surfaces, roadways, play areas and landscape treatment |
|
|
Key Parks |
Millwall Park/island Gdns |
200 |
Sec 106 |
Improvements
to childrens play areas, integration of site with Mudchute, tree planting
based on an agreed Masterplan |
|
|
Key Parks |
Meath Gardens Improvements |
150 |
LPP |
Key
accessibility improvements to integrate a new parkland area with new bridge,
entrance, lighting and security improvements |
|
|
Local Priority Parks |
Poplar Park |
240 |
Sec 106 |
Continuation
of programme to improve infrastructure, bring a redundant building into
positive use, refurbish tennis facilities, landscape enhancement |
|
|
Local Priority Parks |
St Johns Park |
109 |
Sec 106 |
Improvement
of multi use games area, redesign of wheel park and children's play area,
footpath improvements |
|
|
Local Priority Parks |
Wapping Gdns |
100 |
LPP |
Improvement
of multi use games area, landscape improvements, biodiversity enhancement |
|
|
Local Priority Parks |
Cantrell Rd Open Space |
100 |
LPP |
Work
will improve integration with the cemetery park through landscape and
biodiversity enhancements, natural play area and related facilities |
|
|
Local Priority Parks |
Stepney Green Gdns |
55 |
LPP/Sec 106 |
Low
key improvements to improve infrastructure and landscape diversity of this
site with heritage value |
|
|
Total |
1,414 |
|
|
|
|
|
|
|
Libraries |
Bancroft Library - Improvements |
255 |
LPP |
To undertake
Health & Safety work, renovate and redecorate public areas of the library
and install improved IT access |
|
|
|
|
|
|
|
|
|
Preventing Crime |
CCTV Investment Funding. |
500 |
LPP |
CCTV
Investment Funding to increase CCTV coverage in view of the success of the
CCTV Control Centre, and to replace life expired equipment where CCTV is
still justified |
|
|
Total |
2,169 |
|
|
|
|
|
|
|
|